Installation and Maintenance of Solar Panels

Practical renewable energy technology that reduces costs and helps the environment

img

Get in touch

+919220947356

13P, Captain Ganpat Ram Yadav Marg, Block D, Indira Colony 2, Sector 52, Gurugram, Haryana 122003

Download

PM Kusum Haryana: What It Offers Landowners

Not every acre in Haryana earns its keep. Across the south of the state — Mahendragarh, Bhiwani, Rewari, parts of Sirsa — there is land that gives a thin return in a good year and nothing much in a bad one. PM Kusum Haryana offers those landowners a different proposition entirely: host a grid-connected solar power plant on that ground and earn a fixed income from it for twenty-five years.

Rayax works across Haryana as a PM Kusum EPC partner for land-based projects. We assess whether your plot is genuinely viable, handle HAREDA registration, coordinate evacuation approval with the DISCOM, and build and operate the plant — while the land title stays with you throughout.

The PM Kusum Yojana Haryana is administered by HAREDA through the state's Saral portal, with DHBVN and UHBVN as the distribution companies and HERC setting the applicable tariff. Haryana's combination of dense sub-station coverage and low-producti3vity land in the south makes it one of the more workable states for land-based solar.

Where the Opportunity Is in Haryana

  • Southern Haryana — Mahendragarh, Bhiwani, Rewari and parts of Sirsa — has substantial low-yield and barren land where solar generation earns considerably more per acre than the crop currently does.
  • Haryana has comparatively dense 33/11 kV sub-station coverage, which shortens evacuation lines and improves project economics against states where the nearest connection point is far away.
  • Proximity to the NCR load centre means the power generated is consumed close to where it is produced, which strengthens the case for local generation capacity.
  • Haryana's land records are largely digitised, which speeds up title verification and reduces the documentation delays that stall projects elsewhere.

Benefits for Haryana Landowners

  • A fixed, predictable income from land that currently produces little — paid on a schedule, unaffected by monsoon or crop prices.
  • Full retention of land ownership. The title stays in your name for the entire project term.
  • Three participation routes: own the plant, co-develop with Rayax, or lease the land and collect rent.
  • Twenty-five years of contracted revenue under a power purchase agreement with the DISCOM.
  • No collateral requirement under the available financing routes.

Eligibility in Haryana

  • Haryana landowners, farmer groups, panchayats, cooperatives and FPOs.
  • Clear title (jamabandi or fard) or a registered long-term lease over the plot.
  • Valid Parivar Pehchan Patra (family ID), required for most Haryana state scheme benefits.
  • Aadhaar and an active bank account in the applicant's name.
  • Roughly four to five acres per MW, contiguous, with workable distance to a sub-station that has spare capacity.

PM Kusum Yojana Online Registration in Haryana

Registration is handled by HAREDA (Haryana Renewable Energy Development Agency) through the Haryana Saral portal, with DHBVN and UHBVN managing evacuation and metering, and HERC (Haryana Electricity Regulatory Commission) setting the applicable tariff. Application windows open periodically and are usually capacity-capped, so preparing documentation in advance is worthwhile.

  1. Rayax carries out a free viability check — plot size, terrain and distance to the nearest sub-station with available capacity.
  2. Register on the Haryana Saral portal under the PM Kusum land-based project category when a window opens.
  3. Submit Aadhaar, Parivar Pehchan Patra, jamabandi and bank details, along with the technical documentation.
  4. Receive the letter of award from HAREDA and finalise your participation route — ownership, co-development or lease.
  5. Rayax executes design, financing, construction and DISCOM evacuation approval, then operates the plant for 25 years.

Why Choose Rayax as Your PM Kusum EPC Partner in Haryana

Rayax knows how Haryana actually processes these projects — HAREDA timelines, Saral portal behaviour, and how DHBVN and UHBVN differ in handling evacuation approval. Before anything else we tell you whether your land is viable, because distance to a sub-station with spare capacity decides more projects than any other factor and there is no point starting paperwork on a plot that will not connect. From there we handle registration, prepare the bankable DPR, arrange financing, build to MNRE standards with tier-1 solar panels, and run the plant for its full term.

PM Kusum Haryana

Get Your Free Haryana Land Assessment

Own land in Haryana that isn't earning what it should? Request a free PM Kusum Haryana viability assessment. Send us your village, plot size and approximate distance to the nearest sub-station, and we will tell you plainly whether a solar plant makes sense there — including when it doesn't.

img Get resolutions to all questions

FAQs

How do I apply for PM Kusum in Haryana?

Applications for land-based projects go through the Haryana Saral portal under HAREDA. You will need Aadhaar, Parivar Pehchan Patra, jamabandi records, bank details and information about the nearest sub-station. Rayax completes the registration with you and tracks it through to letter of award.

Which agency runs PM Kusum in Haryana?

HAREDA, the Haryana Renewable Energy Development Agency, implements the scheme. DHBVN and UHBVN act as the distribution companies for evacuation and metering, and HERC sets the applicable tariff.

What does a PM Kusum solar plant cost in Haryana?

There is no fixed price list. Cost turns on capacity, terrain and — above all — distance to a sub-station with spare capacity, since evacuation infrastructure is often the largest variable. Rayax gives you an itemised assessment with the assumptions written out before you commit anything.

How much land do I need in Haryana for a PM Kusum project?

About four to five acres per MW, so a 500 kW plant needs roughly two to two and a half acres. It should be contiguous and reasonably level, and close enough to a 33/11 kV sub-station that evacuation stays economic.

Which Haryana districts are best suited to PM Kusum solar plants?

Mahendragarh, Bhiwani, Rewari and parts of Sirsa stand out, because they combine low-productivity land with reasonable sub-station coverage. That said, viability is plot-specific — two neighbouring farms can differ entirely depending on grid access.

Do I lose ownership of my land under PM Kusum?

No. The title stays in your name for the whole term whichever route you take — ownership, co-development or lease. At the end of the project period the land reverts to unrestricted use.

Make an Enquiry


img Brands We Have Empowered with Solar

Brands We Have Empowered

clients-logo
clients-logo
clients-logo
clients-logo
clients-logo

What are you looking for?